WELCOME

WELCOME TO PALODE.TK, A COMPLETE DATABASE OF THE REGION
Site Admin: Jijo Palode, Facebook Admin: Saadirsha Palode, Office Admin: Jaggu Aneesh, Photos: Ajith palode, Orma Studio, Rachana Studio, Arun Nadh vithura, Reporter: Anwarshan Office: Infosoft palode,Advisors: Nadirsha, Thulaseedharan nair, Manoj Palaodan and Hidayath Jaffar. Site Designed and Maintaned by Colour+ Creative Solutions - Chennai NB:Concidring the large volume of spam mails we have implemented post moderation. Your posts will appear very soon in a maximum time of 3 hours.

Sunday, October 23, 2011

ലോവര്‍ മീന്‍മുട്ടി ജല വൈദ്യുത പദ്ധതി, പാലോട്



Operator: Kerala State Electricity Board
Configuration: 2 X 1.5 MW, 1 X 500 kW Francis
Operation: 2006
T/G supplier: VA TECH, TD Power Systems
EPC: VA TECH, Asian Techs
Quick facts: In Jul 2003, this small hydro was contracted to Asian Techs-VA Tech Joint Venture at a cost of Rs 12.38cr. The initial schedule called for completion by Feb 2005 but in the event, the first unit was not synchronized until 12 Mar 2006. Average output is expected to be 7.6 GWh/yr.